Contractor · Electrical

William Deak

598 building permits since 2017 in New Fairfield town, CT; Ridgefield town, CT and Brookfield town, CT, across 5 counties — $5,936,834 in reported job value over 593 permits that state one.

Building permits
598
Reported job value
$5.9M
Active
2017–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • New Fairfield town, CT169
  • Ridgefield town, CT136
  • Brookfield town, CT121
  • New Milford town, CT106
  • Redding town, CT49
  • Stamford town, CT5
  • Winchester town, CT2
  • New Canaan town, CT2
  • Dover town, NY2
  • Pleasant Valley town, NY2

Permits by year

By issue date (application date where there is none).

050100
82
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
201710
201853
201924
202074
202182
202265
202375
202477
202563
2026 (YTD)75

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical534
  • Generators520
  • Electric meters18
  • EV chargers16
  • Pools & hot tubs13
  • HVAC11
  • Gas6
  • Remodels5
  • Plumbing5
  • Heat pumps4

Permit types

As the building departments classify them.

  • Electrical Permit369
  • Generator Permit Application154
  • Generator47
  • Electrical Permit Application14
  • Electrical (& Portable Generators)6
  • Building Permit3
  • Building Permit Application1
  • Building Permit (No Trades)1

Recent permits

The 3 newest on file, with their parcels on Landstats.

DateTypeWorkJurisdictionJob valueParcel
Oct 29, 2026Electrical PermitSupply and install a Charge Point hard wired EV charger located on the rear wall of the garage. A 60 Amp rated circuit will be installed for a 48 Amp maximum chNew Milford Town$3,000View parcel
Oct 29, 2026Electrical PermitInstall wiring for owner supplied Charge Point hardwired EV charger. A 30 Amp circuit will be installed for a 24 Amp maximum charge rate. The charger will be inNew Milford Town$1,000View parcel
Oct 29, 2026Electrical PermitRemove the existing 100 Amp meter box, service drop, and main electrical panel. Supply and install a new Square D Homeline 200 Amp 30-space panel with new circuNew Milford Town$6,000—

Permit status

Where its permits stand, as the departments report them.

  • Completed468
  • Active117
  • Stop work ordered9
  • Closed2
  • Not stated2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.